The Pacific Beach & Summit RR

M.O.W.

Home
Development
Grade Construction
M.O.W.
Roster
EVENTS
Rules
ALL ABOARD!
Life and Times
Railroad Links
Telegraph us! (Via email)

(Maintenance of Way)

benedicttrain_23752.gif

pb43.jpg
PB&S RR gains access to the world!

pb28.jpg
Shack, PB&S RR Trainmaster raising the track.

pb40.jpg
Senior Member of MOW Crew, Alma

George doing a little track maintenance.
picture018.jpg
Apprentice Welder, Laura looks on.

switch16.jpg
New switch throws.

b_trin1.gif

Materials:
 
Rail is 3/8" X 1" hot rolled steel in 20' lengths. Ties are recycled colored plastic 1 1/2" X 1 1/2" X 8' stock. Ties were routed for rail, which was then pressed with a port-a-power into the grooves of the 14" length ties. Roadbed is 5/8" minus clean rock.

nextpg.gif