|
Our Track
|
|
| Track building with Joe, Bill, Brian and Monty. |
Gage is 7 1/2" and the scale is 1 1/2" and 2 1/2".
It is interesting to note that everything for the layout is done on site; bending tracks for 50 foot
minium radius turns, and all ties, (recycled plastic... 1 1/2" x 1 1/2"), are cut and routed individually.
(The track has a tie about every 4-6 inches).
|
|
| Supt. Tearney building his railroad. |
|
|
| Track instalation to loop around Bay Rum Island. |
| Shack, Trainmaster of PB&S RR |
|
|
| "No Bo's ride my train!" |

|
 |
|
|
|
| (Before the "raising" of Troll Bridge). |
History and Background
Construction of the railroad commenced on May 5 '04. Work started with help and determination
of members and friends of the Pacific Beach & Summit RR.
"Kelly's Loop" has been completed around
the Pacific Beach Station. Connections to Troll Bridge, Billy Goat Gulch, North Shore Hot Springs,
Conductor's Cove, and Bay Rum Island are now in service. Coming
soon... Shack's Shack, The Summit Round House and an extension of the rail!
THANK YOU to all!
Supt. PB&S RR

|
 |
 |
 |
|
|
 |
 |
 |
|
|
|