The Pacific Beach & Summit RR

Development of PB&S RR

Home
Development
Grade Construction
M.O.W.
Roster
EVENTS
Rules
ALL ABOARD!
Life and Times
Railroad Links
Telegraph us! (Via email)

staemen.gif

offwego.jpg

Our Track

workparty.jpg
Track building with Joe, Bill, Brian and Monty.

Gage is 7 1/2" and the scale is 1 1/2" and 2 1/2".  It is interesting to note that everything for the layout is done on site;  bending tracks for 50 foot minium radius turns, and all ties, (recycled plastic...
1 1/2" x 1 1/2"), are cut and routed individually.  (The track has a tie about every 4-6 inches).

trackfabrication.jpg
Track Fabrication

pb14.jpg
Supt. Tearney building his railroad.

pb3.jpg
Track instalation to loop around Bay Rum Island.

im000566.jpg
Raising Troll Bridge

Shack, Trainmaster of PB&S RR
pb25.jpg
"No Bo's ride my train!"

035.gif

1stweek.jpg
(Before the "raising" of Troll Bridge).

History and Background
 
Construction of the railroad commenced on May 5 '04.  Work started with help and determination of members and friends of the Pacific Beach & Summit RR.
 
"Kelly's Loop" has been completed around the Pacific Beach Station.  Connections to Troll Bridge, Billy Goat Gulch, North Shore Hot Springs, Conductor's Cove, and Bay Rum Island are now in service.  Coming soon... Shack's Shack, The Summit Round House and an extension of the rail!
 

THANK YOU to all!

Supt. PB&S RR

conductorpbsrr.jpg

nextpg.gif